Item Number: 11.



MEETING DATE:  1/14/2020

DEPARTMENT:
RESOURCE MANAGEMENT AGENCY

DEPT HEAD/DIRECTOR: Harry Mavrogenes, Director of Resource Management Agency

AGENDA ITEM PREPARER: Damon Felice

SBC DEPT FILE NUMBER: 790

SUBJECT:

RESOURCE MANGEMENT AGENCY – H. MAVROGENES

Approve Plans, Specifications and Bid Solicitation of the New Behavioral Health Center Site Work Package - PWB-1810; and authorize the adverting for bids.

SBC FILE NUMBER: 790

AGENDA SECTION:

CONSENT AGENDA

BACKGROUND/SUMMARY:

On October 8, 2019, the board approved the contract with Silver Creek Industries for the construction of the pre-engineered buildings for the new Behavioral Health Center.  The pre-engineered contractor does not perform site work so a second contractor is needed to perform that scope of work.  The work associated with this work includes but in not limited to grading, site concrete, AC paving, site lighting, site utilities, building IT and building fire alarm.

 

Also on the board agenda today is a change order for the building foundations that was removed from the site work package and added to the pre-engineered building package. 

 

Additionally, the findings for the Mitigated Negative Declaration which was prepared for the project, is included.



BUDGETED:

Yes

SBC BUDGET LINE ITEM NUMBER:



CURRENT FY COST:



STAFF RECOMMENDATION:

It is respectfully recommended that the Board of Supervisors:

 

  1. Make the attached CEQA findings.
  2.  Adopt plans and specifications for PWB-1810 New Behavioral Health Center Site Work Package and authorize the advertising for bids.


ADDITIONAL PERSONNEL:
No


BOARD ACTION RESULTS:

Approved plans and specifications per staff recommendation. (5/0 vote)
ATTACHMENTS:
DescriptionUpload DateType
New Behavioral Health Center_ISMND12/19/2019Backup Material
190115 100% Site Package Specs (3)12/20/2019Backup Material
BHC CEQA Findings12/20/2019Backup Material
Site Package Drawings Part 112/20/2019Site Plan
Site Package Drawings Part 212/20/2019Site Plan
Site Package Drawings Part 312/20/2019Site Plan