Item Coversheet

SAN BENITO COUNTY

AGENDA ITEM
TRANSMITTAL FORM

Mark Medina

District No. 1

Anthony Botelho

District No. 2

Peter Hernandez

District No. 3

 

Jim Gillio

District No. 4
Vice-Chair

Jaime De La Cruz

District No. 5
Chair


Item Number: 14.



MEETING DATE:  10/22/2019

DEPARTMENT:
RESOURCE MANAGEMENT AGENCY

DEPT HEAD/DIRECTOR: Harry Mavrogenes

AGENDA ITEM PREPARER: Scott Lines

SBC DEPT FILE NUMBER: 105

SUBJECT:

RESOURCE MANAGEMENT AGENCY - H. MAVROGENES

Approve amendment #3 to the contract with Field Solutions Inc. for maintenance of the extraction well pumps at John Smith Landfill.  The contract amendment will add additional compensation in the amount of $10,504.00 for a total contract amount of $92,204.00.   

SBC FILE NUMBER: 105

AGENDA SECTION:

CONSENT AGENDA

BACKGROUND/SUMMARY:

On May 6, 2014 the County entered into an initial contract with Field Solutions Inc. to provide maintenance and monitoring of the extraction well system at John Smith Landfill.  Costs of the original contract and two subsequent amendments have totaled $81,700 over the previous five-and-a-half years.

 

Field Solutions Inc. is proposing to remove the existing control panels for extraction well pumps EW-2 and EW-3 and replace them with new panels similar to the one that has been installed near the EW-5 wellhead. FSI will first expose the existing conduit at the two wellhead locations. Next, an aboveground steel rack will be installed near each wellhead and the conduit extended on to each steel rack. The pump saver, motor starter, and time meter will be moved into the new panel enclosure installed near each well head along with an on/off switch. These components will be placed inside the enclosure in the same configuration as the well EW-5 panel. The on/off switch and pump controls will all be mounted on a steel rack.

 

Approving amendment #3 to the contract will allow Field Solutions Inc. to complete this unexpected maintenance of the extraction well pumps at John Smith Landfill.  It is anticipated that the work will begin within three weeks of approval of this contract amendment and be completed within three days after is commences.    

 



BUDGETED:

Yes

SBC BUDGET LINE ITEM NUMBER:



CURRENT FY COST:



STAFF RECOMMENDATION:

Approve amendment #3 to the contract with Field Solutions Inc. for maintenance of the extraction well pumps at John Smith Landfill.  The contract amendment will add additional compensation in the amount of $10,504.00 for a total contract amount of $92,204.00.   

ADDITIONAL PERSONNEL:
No


BOARD ACTION RESULTS:

Approved Amendment #3 to the contract with Field Solutions Inc. per staff recommendation. (5/0 vote)
ATTACHMENTS:
DescriptionUpload DateType
proposal10/8/2019Cover Memo
Contract Amendment10/16/2019Cover Memo