MEETING DATE: 5/21/2019
DEPARTMENT: RESOURCE MANAGEMENT AGENCY
DEPT HEAD/DIRECTOR: Acting
AGENDA ITEM PREPARER: Gregory J. Bucknell, PE
SBC DEPT FILE NUMBER: 105
SUBJECT:
RESOURCE MANAGEMENT AGENCY
Adopt the plans and specifications for the PWB-1908 Shore Road – San Felipe Road Bridges Guard Rails – STPLX-5943(057); find the projects are categorically exempt under CEQA Guidelines Sections 15301 and 15302; and authorize the advertisement for bids.
SBC FILE NUMBER: 105
AGENDA SECTION:
CONSENT AGENDA
BACKGROUND/SUMMARY:
This project is funded under the Federal Highway Administration (FHWA) Highway Bridge Program (HBP) to upgrade the safety of bridge barrier systems of two existing bridge structures. The project was re-initiated and funds re-obligated in 2009 after losing its initial funding due to project delivery issues. The preliminary engineering phase of the project is now complete and the project has received, through Caltrans, the required Federal Authorization to Proceed with Construction and to advertise the project.
This project includes the construction of bridge barrier rails and approach rails to replace the existing system at Shore Road over Tequisquita Slough Overflow Bridge located east of Frazier Lake Road and west of Lake Road and at San Felipe Road over branch of Santa Ana Creek Bridge located north of State Route 156 (Pacheco Pass Highway).
The plans and specifications for these projects are now complete and presented for your approval and authorization to advertise for bids. Bids will be due June 27, 2019 and are scheduled to come back to the Board for award on July 23, 2019. Construction is to begin in August and to last three months.
BUDGETED:
Yes
SBC BUDGET LINE ITEM NUMBER:
CURRENT FY COST:
STAFF RECOMMENDATION:
Staff respectfully recommends that the Board:
1. Adopt the plans and specifications for PWB-1908 Shore Road – San Felipe Road Bridges Guard Rails – STPLX-5943(057);
2. Find the project is categorically exempt under CEQA Guidelines sections 15301 and 15302;
3. Authorize the advertisement for bids.